Contract n. 5000000903
Design and development of all the technical documentation and authorization for the dismantling of the airlift on which were housed n. 2 oil pipelines and n. 1 gas pipeline in correspondence of crossing of the Arno River in the Municipality of Florence.
Aerial bridge demolition on the Arno River
Category: "Oil & gas" network and systems design | Certifying Engineering and environmental consultancy | Construction supervision and assistance for construction sites | Topographical surveys and Cartographic elaborations |
Client: Snam Rete Gas S.p.A.
Year: 2011
Order by Client
- Air Liquide S.p.A.
- Atel S.p.A.
- Atena S.p.A.
- CONSORZIO CAV.TO.MI. s.c.r.l.
- Edison S.p.A
- En Plus s.r.l.
- Enereco S.p.A.
- ENI R&M S.p.A.
- ENI S.p.A.
- Eniservizi S.p.A.
- Impresa Tre Colli S.p.A.
- IREN S.p.A. – IRETI S.p.A.
- Isolconfort s.r.l.
- Italgas Reti S.p.A.
- LU.VE. S.p.A.
- Marcegaglia S.p.A.
- MODENA S.c.a.r.l.
- Praoil Oleodotti Italiani S.p.A.
- SAIPEM S.p.A.
- Snam Rete Gas S.p.A.
- Snamprogetti S.p.A.
- Società Gasdotti Italia S.p.A.
- STOGIT S.p.A.
- Technip S.p.A
- TECHNO ENGINEERING s.r.l.