Portfolio

Our partners selected the Leardi know-how for some of their important projects.

Gas pipeline “Forlì – Faenza” DN 400 (16”) and Trap area plant of Faenza

Gas pipeline “Forlì – Faenza” DN 400 (16”) and Trap area plant of Faenza

Category: "Oil & gas" network and systems design | Certifying Engineering and environmental consultancy | Civil & Industrial Design |

Client: Snam Rete Gas S.p.A.

Year: 2004

Contract n. 7300000473 Integrated civil-mechanical and electro-instrumental design of the gas pipeline “Forlì – Faenza” DN 400 (16”) - P = 75 bar and the Faenza Traps Area plant, including the acquisition of authorizations for the construction of the pipeline.

Read more »
Gas pressure reduction plant IPRS 10 in Robecchetto con Induno (MI)

Gas pressure reduction plant IPRS 10 in Robecchetto con Induno (MI)

Category: Certifying Engineering and environmental consultancy | Civil & Industrial Design | Topographical surveys and Cartographic elaborations |

Client: Snam Rete Gas S.p.A.

Year: 2003

Integrated civil-mechanical and electro-instrumental design of the IPRS 10 - 75/12 bar plant including the acquisition of the authorization for the construction, construction and HSE management according to Legislative Decree no. 81/08.

Read more »
Gas pipeline “Pertengo-A.I.A.V. Vercelli” DN 300 (12″)

Gas pipeline “Pertengo-A.I.A.V. Vercelli” DN 300 (12″)

Category: "Oil & gas" network and systems design | Certifying Engineering and environmental consultancy | Civil & Industrial Design | Construction supervision and assistance for construction sites | Technical Legal and Asset consultancy | Topographical surveys and Cartographic elaborations |

Client: Atena S.p.A.

Year: 2002

Integrated civil-mechanical and electro-instrumental design of the “Pertengo-A.I.A.V Vercelli” DN 300 (12") - P = 75 bar gas pipeline and the RE.MI. plant of Pertengo, including the acquisition of authorizations for the construction of the plant, construction and HSE management...

Read more »