Wind farm of Lucito (CB)
Topographycal services including the study and optimization of the route of the electric line and its interconnection with the national grid (km 20) and the detailed survey of the wind farm areas.
Read more »Our partners selected the Leardi know-how for some of their important projects.
Topographycal services including the study and optimization of the route of the electric line and its interconnection with the national grid (km 20) and the detailed survey of the wind farm areas.
Read more »Contract n. 7300000423 Integrated civil-mechanical and electro-instrumental design of the rebuilding of the IPRS 10 75/12 bar system including the acquisition of the authorization for the construction of the plant, construction and HSE management according to Legislative Decree no. 81/08.
Read more »Civil, mechanical and electro-instrumental executive design, including the optimization of the DN 400 (16") pipeline route - P = 75 bar and connection to the Combined Cycle Power Plant in San Severo (FG). Accessibility of passage and preparation of documentation...
Read more »Contract n. 71000001854 Civil and mechanical executive planning of the interventions for the safety of the pipeline "Import of the USSR DN 900 (36") - P = 75 bar, including the preparation of the geological-technical and hydraulic documentation for the...
Read more »Contract n. 73000000369 Integrated civil-mechanical and electro-instrumental design of the “Bosentino – Trento” DN 300 (12 ") - 75 bar gas pipeline, including the acquisition of authorizations for the construction of the plant, environmental impact assessments and all geological-technical surveys...
Read more »Contract n. 7300000473 Integrated civil-mechanical and electro-instrumental design of the gas pipeline “Forlì – Faenza” DN 400 (16”) - P = 75 bar and the Faenza Traps Area plant, including the acquisition of authorizations for the construction of the pipeline.
Read more »