Portfolio

Our partners selected the Leardi know-how for some of their important projects.

Engineering and construction site management services Western Central District

Engineering and construction site management services Western Central District

Category: "Oil & gas" network and systems design | Certifying Engineering and environmental consultancy | Civil & Industrial Design | Construction supervision and assistance for construction sites | Technical Legal and Asset consultancy | Topographical surveys and Cartographic elaborations |

Client: Snam Rete Gas S.p.A.

Year: 2007

Starting date: 2005 Contract n. 5000000597 Framework agreement for integrated engineering services for executive design (civil, mechanical and electro-instrumental), construction and health and safety (HSE) management according to Legislative Decree no. 81/08 including technical consultancy activities in the field of...

Read more »
Gas pressure reduction system of Ameno (NO) HPRS 10

Gas pressure reduction system of Ameno (NO) HPRS 10

Category: Certifying Engineering and environmental consultancy | Civil & Industrial Design | Topographical surveys and Cartographic elaborations |

Client: Snam Rete Gas S.p.A.

Year: 2006

Contract n. 7300000423 Integrated civil-mechanical and electro-instrumental design of the rebuilding of the IPRS 10 75/12 bar system including the acquisition of the authorization for the construction of the plant, construction and HSE management according to Legislative Decree no. 81/08.

Read more »
Gas pipeline “Pietramontecorvino-San Severo” DN 400 (16″)

Gas pipeline “Pietramontecorvino-San Severo” DN 400 (16″)

Category: "Oil & gas" network and systems design | Certifying Engineering and environmental consultancy | Civil & Industrial Design | Construction supervision and assistance for construction sites | Technical Legal and Asset consultancy | Topographical surveys and Cartographic elaborations |

Client: En Plus s.r.l.

Year: 2006

Civil, mechanical and electro-instrumental executive design, including the optimization of the DN 400 (16") pipeline route - P = 75 bar and connection to the Combined Cycle Power Plant in San Severo (FG). Accessibility of passage and preparation of documentation...

Read more »