Detailed design of the connecting cable between the wind turbine park and the connection point to the national grid. Execution of integrative topographic surveys and detailed study of the access roads to the areas and of the entire wind farm.
“San Giorgio – La Molara” Wind Farm (BN)
Category: Civil & Industrial Design | Topographical surveys and Cartographic elaborations |
Client: Edison S.p.A
Year: 2010
Order by Client
- Air Liquide S.p.A.
- Atel S.p.A.
- Atena S.p.A.
- CONSORZIO CAV.TO.MI. s.c.r.l.
- Edison S.p.A
- En Plus s.r.l.
- Enereco S.p.A.
- ENI R&M S.p.A.
- ENI S.p.A.
- Eniservizi S.p.A.
- Impresa Tre Colli S.p.A.
- IREN S.p.A. – IRETI S.p.A.
- Isolconfort s.r.l.
- Italgas Reti S.p.A.
- LU.VE. S.p.A.
- Marcegaglia S.p.A.
- MODENA S.c.a.r.l.
- Praoil Oleodotti Italiani S.p.A.
- SAIPEM S.p.A.
- Snam Rete Gas S.p.A.
- Snamprogetti S.p.A.
- Società Gasdotti Italia S.p.A.
- STOGIT S.p.A.
- Technip S.p.A
- TECHNO ENGINEERING s.r.l.