Starting date: 2015
Civil, mechanical and electro-instrumental design at the executive level of the new “Cellino – San Marco – Teramo” pipeline DN 500 (20 “) – P = 75 bar including 16 interception systems and 2 inspection plants. Executive engineering of drainage, piling, drains, etc., with preparation of technical documentation for authorization purposes. Technical support during the Ministerial authorization procedure.

“Cellino – Teramo – San Marco” gas pipeline DN 500 (20″) – II Portion
Category: "Oil & gas" network and systems design | Certifying Engineering and environmental consultancy | Civil & Industrial Design |
Client: Società Gasdotti Italia S.p.A.
Year: 2016