Civil, mechanical and electro-instrumental executive design, including the optimization of the DN 400 (16″) pipeline route – P = 75 bar and connection to the Combined Cycle Power Plant in San Severo (FG). Accessibility of passage and preparation of documentation for the purposes expropriation.

Gas pipeline “Pietramontecorvino-San Severo” DN 400 (16″)
Category: "Oil & gas" network and systems design | Certifying Engineering and environmental consultancy | Civil & Industrial Design | Construction supervision and assistance for construction sites | Technical Legal and Asset consultancy | Topographical surveys and Cartographic elaborations |
Client: En Plus s.r.l.
Year: 2006