Architectural and structural design for changes to the pumping system and electrical control room of the Voltaggio pumping station serving the DN 300 (12 “) “Fegino – Ferrera” and DN 650 (26″) “Genova – Ferrera” oil pipelines.
Voltaggio Pumping station – Revamping of the pump system and electrical panel room
Category: "Oil & gas" network and systems design | Civil & Industrial Design |
Client: ENI S.p.A.
Year: 2012
Order by Client
- Air Liquide S.p.A.
- Atel S.p.A.
- Atena S.p.A.
- CONSORZIO CAV.TO.MI. s.c.r.l.
- Edison S.p.A
- En Plus s.r.l.
- Enereco S.p.A.
- ENI R&M S.p.A.
- ENI S.p.A.
- Eniservizi S.p.A.
- Impresa Tre Colli S.p.A.
- IREN S.p.A. – IRETI S.p.A.
- Isolconfort s.r.l.
- Italgas Reti S.p.A.
- LU.VE. S.p.A.
- Marcegaglia S.p.A.
- MODENA S.c.a.r.l.
- Praoil Oleodotti Italiani S.p.A.
- SAIPEM S.p.A.
- Snam Rete Gas S.p.A.
- Snamprogetti S.p.A.
- Società Gasdotti Italia S.p.A.
- STOGIT S.p.A.
- Technip S.p.A
- TECHNO ENGINEERING s.r.l.