Gas pipeline “Poggio Renatico-Cremona” DN 1200 (48″)
Detailed topographic surveys of stakeout of the "Poggio Renatico - Cremona" gas pipeline line - P = 75 bar with graphic elaborations related to critical areas and crossing sections.
Our partners selected the Leardi know-how for some of their important projects.
Detailed topographic surveys of stakeout of the "Poggio Renatico - Cremona" gas pipeline line - P = 75 bar with graphic elaborations related to critical areas and crossing sections.
Contract n. 7300000423 Integrated civil-mechanical and electro-instrumental design of the rebuilding of the IPRS 10 75/12 bar system including the acquisition of the authorization for the construction of the plant, construction and HSE management according to Legislative Decree no. 81/08.
Civil, mechanical and electro-instrumental executive design, including the optimization of the DN 400 (16") pipeline route - P = 75 bar and connection to the Combined Cycle Power Plant in San Severo (FG). Accessibility of passage and preparation of documentation...
Topographic construction management along the “Tirreno Power” gas pipeline DN 500 (20") pipeline - P = 75 bar including tracing, verification of coverage, final measurements and preparation of final AS-BUILT drawings.
Topographic detailed surveys and measurement of precision geodetic network along the railway lines: Monza-Molteno-Lecco km. 45 - Lecco-Albate Camerlata km. 17 Calolziocorte-Lecco km. 7 with the return of detailed graphic drawings.